3. Check the position of the shaft. The marker (1) has to correspond to the edge when the sash is opened 90°. 4. Remove the visible part of the center fixation (1). If the center fixation is missing, check the vicinity of the rebate and the corner bearing and remove the loose part. 5. Remove the mounting aid (1). 6. Check the gap of the rebate vertically and adjust to 12.5 mmm if necessary. Please see following instructions for height adjustment Adjustments: The side and contact pressure settings remain the same Height adjustment: IMPORTANT NOTE: height adjustment may exclusively be consucted at the load transfer and never at the corner bearing! In order to prevent any faulty adjustments, a safety pin (included in shipment) has to be mounted in the height adjustment screw of the corner bearing. 32 KATZBECK-MANUAL
17. Operating PPS (Parallel-Placed-Sliding-Components) Parallel position for the permanent ventilation of the room Open / Slide (ventilation position) Closed position for when the room is unattended for long periods or when no ventilation is desired. 18. Adjustmenst PPS (Parallel-Placed-Sliding-Components) Only authorized licensed professionals are permitted to perform the remounting and unhinging, as well as adjusting the fittings! Horizontal adjustment of sash: Parallel adjustment of rails: KATZBECK-MANUAL 33
Laden...
Laden...
Laden...